Building Control Application Form

Please complete this form in full as an instruction to Assure Building Control to carry out the Building Control function as Building Control Body and Approved Inspector as designated under the Building Act 1984 and the Building (Approved Inspectors) (Amendment) Regulations 2010.

About the Project

Full description of all work that is to be covered by Building Regulation Application
The address of where the work is to be carried out
The postcode of where the work is to be carried out
Weeks
Enter the approximate length of time the project is expected to be on site
E.g., 17/08/2017

Have any of the following ‘Optional Requirements’ been attached to the planning approval?

Once planning permission has been granted I will inform Assure Building Control of any ‘Optional Requirements’ attached to the planning approval under Building Regulations 2010

NB Such requirements can include the following

(aa). regulation 36(2)(b) (Optional water efficiency requirement of 110 litres per person per day)

(bb). Schedule 1 Part M optional requirement M4(2) (category 2- accessible and adaptable dwellings);

(cc). Schedule 1 Part M optional requirement M4(3) (category 3- Wheelchair user dwellings)

Payment

Building Control Fees. payable in two instalments.  

  1. SUBMISSION FEE (40% of the Total Fee) Invoiced once the project is received, payable in 7 Days.  
  2. INSPECTION FEE (60% of the total fee) Invoiced once work starts on site, payable in 7 Days.

Details should be entered below from the quotation received.

£
Invoiced once the project is received, payable in 7 Days.
£
Invoiced once work starts on site, payable in 7 Days.

Applicant

Please provide the best number to contact you on

Person Responsible for payment of fee (OTHER) Details

Project Details

New Build, Extension, Underpinning or Basement

Please send a location plan to admin@assurebuildingcontrol.co.uk

Note if your proposals are located close to a public sewer, you may be required to enter into a ‘build over’ agreement with the water authority which is likely to incur additional charges payable to the water authority.

Please note that some Water Authorities charge a fee for searching their map of sewers, if applicable, these charges will be added to our invoice as a disbursement (Typically £30 - £50)

Building Regulations 2010 Part P Electrical Safety

I confirm that for this domestic project, any electrical work will be carried out by a member of a ‘Part P’ Competent Person Scheme who will independently certify the work. It is my responsibility to ensure that I receive a certificate within 30 days of completion of the work.

Plans & Files
Files must be less than 64 MB.
Allowed file types: doc docx pdf jpeg jpg.

Uploading multiple files

To upload multiple files with your application please choose the first file then then click/tap the 'Upload' button. Once uploaded you will be able to repeat the process to add more files to the application

CAPTCHA
This question is for testing whether you are a human visitor and to prevent automated spam submissions.
Image CAPTCHA
Enter the characters shown in the image.